Q.
1

a) Identification of the main activities
b) Collection of cost pool
c) Determination of the activity cost drivers
d) Calculation of activity driver rate
e) Charging the cost of activities to products Select the correct sequence of the above steps:

 

 

  • A

    (a), (b), (c), (e), (d)

     

  • B

    (a), (b), (e), (e), (c)

     

  • C

    (a), (b), (c), (d), (e)

     

  • D

    (a), (d), (c), (b), (e)