Q.
1
  • A

    Standard costs are based on scientific analysis and engineering studies while estimated costs are based on historical basis.

     

  • B

    Standard cost emphasis is on “what cost will be” while estimated cost emphasis is on “what cost should be”.

     

  • C

    Standard costs are more frequently revised compared to estimated cost.

     

  • D

    Estimated costs are more stable than standard costs.